Featured case study
$2M+saved compared to an excavation-based approach
British Embassy
Surveying 3,200 feet of piping and replacing a failed liner with trenchless CIPP lining in Washington, DC.
- 823 ft
- of failed liner removed
- 1,120 ft
- of new CIPP lining installed
- 240 hrs
- saved through trenchless rehabilitation
- 3,200 ft
- of piping surveyed