Our Work with Harvard University Housing

  • Massachusetts / Boston
  • Other published work
Plotted from our published work history, one dot per metro.

Led by the Prescott Street housing at 20-20A and 20-24 Prescott Street, our Harvard work also includes 1306 Massachusetts Avenue, 65 Mt Auburn Avenue, Peabody Terrace, Vanderbilt Hall, Cronkhite Center, and Plympton. At 9-13A Ware Street we completed a riser evaluation study in 2022, with rehabilitation in the queue.

Boston Condominium Communities

Two Boston condominium communities round out our Massachusetts work: Beacon Hill Condominium and The Prince Building.

Local Work

  • Higher EducationHarvard University Prescott Street HousingCambridge, MA2022 to 2025

Industries

A Trusted Partner for University and Multifamily Housing

We have completed 11 Massachusetts buildings: nine for Harvard University housing and two Boston condominiums. See our higher education and multifamily work.

From evaluation to rehabilitation

How we Work

What We Do

Most local work starts with an Infrastructure Intelligence evaluation and continues with CIPP rehabilitation, lining failing pipe from the inside instead of replacing it.

  1. A technician lowering an inspection camera into a roof vent, with the city skyline behind
    01

    Evaluation study

  2. A laptop showing a building floor plan with its pipe sections graded by condition
    02

    Prioritized findings

  3. A green liner inversion drum set up on a rooftop beside a vent stack
    03

    Rehabilitation

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.