A corroded cast iron pipe exposed in an opened wall, its underside rusted through

Industries

Commercial buildings with minimal tenant disruption

Office, retail, and mixed-use buildings, where hidden pipe failures mean tenant disruption and unplanned capital cost: 46 completed commercial buildings.

The challenge

In a commercial building, a hidden pipe failure is a tenant, revenue, and liability problem long before anyone sees it.

46completed commercial buildings

By the Numbers

  • 40–75%less than conventional replacement
  • 50 yrliner life, backed by a 10-year warranty
  • 2–84 inpipe diameters
  • 4–1,000 ftpipe runs
  • 286completed projects
  • 2008founded

Our experience

What we see in Commercial

  1. 01

    Tenant Disruption

    In office, retail, and mixed-use buildings, a failing drain line quickly becomes a tenant problem: closed restrooms, damaged suites, and lost business hours.

  2. 02

    Unplanned Capital Costs

    Pipe failures rarely wait for the budget cycle. A condition-graded evaluation turns surprise repairs into planned, prioritized capital projects.

  3. 03

    Aging Pipe Behind Finished Walls

    Many commercial buildings still run on original drain lines hidden behind finished walls and slabs, where conventional replacement means demolition.

  4. 04

    Water Damage and Liability

    Leaks and backups damage finishes, inventory, and equipment, and raise liability exposure for owners and managers.

The method

Infrastructure Intelligence

Infrastructure Intelligence maps and grades every line in your building, so you can see which failures threaten tenants first and plan rehabilitation around occupancy instead of emergencies.

Explore Infrastructure Intelligence

Our crews

In the field

  • Crew members lining a riser through a vent stack on a building roof
  • Two crew members inverting a liner into a fountain's drain line
  • A crew feeding a hose into a manhole on a lawn
  • A cured CIPP liner, a new white pipe formed inside the old one

Commercial

Featured Projects

All case studies

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.