Promenade Towers, a residential high-rise, seen from its landscaped terrace

Case study

Promenade Towers Riser Rehabilitation

From a sanitary riser evaluation survey to 70 lined riser stacks in a 1,008-unit cooperative, without a full re-pipe.

  • Bethesda, MD
  • 2021 to 2025
Multifamily & Condominiums

Outcomes

70vertical riser stacks lined

  • 2pilot stacks, one per tower
  • 0full re-pipe needed
Client
Promenade Towers cooperative
Location
Bethesda, MD
Scope
Two 18-story towers, 1,008 units, 70 riser stacks lined
Duration
2021 to 2025

01/ 03

Client Context

18
stories, two towers
1,008
residential units
1971
built

Promenade Towers is a high-rise cooperative of two chevron-shaped towers, built in 1971 as a luxury rental complex with its own market, restaurants, health club and shopping arcade, and converted to a cooperative in 1984.

By 2020 its 50-year-old sanitary drain risers were clogged, corroded and brittle, failing so often that maintenance requests came in daily. The board, general manager and facilities manager went looking for an alternative to an invasive and costly re-pipe.

02/ 03

Strategic Approach

  1. 01

    Riser evaluation survey

    In 2021 building management commissioned a Sanitary Riser Evaluation Survey (SRES) to establish the condition of the risers.

  2. 02

    CIPP pilot

    The survey led to a CIPP lining pilot on two kitchen riser stacks, one in each tower, completed in the fall of 2021.

  3. 03

    Full rehabilitation

    The pilot’s success led to a contract to line the remaining 70 vertical riser stacks in both towers, starting in May 2022.

  4. 04

    Turnkey scope

    Kitchen and laundry laterals were re-piped on each floor and every pipe access hole repaired, in a phased, minimally invasive program.

03/ 03

The Poster

Framed project summary for The Promenade: the challenge, the solution and the project highlights

The project poster summarises the work: 50-plus-year-old riser infrastructure restored without a full re-pipe, a successful pilot in both towers, and 70 vertical riser stacks lined.

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.