Case Studies
< 2 wksall piping lined
GSK Drug Manufacturing Plant
Cracked under-slab process piping found weeks before startup, lined around the clock in under two weeks.
- 2 days
- ahead of schedule
- On budget
- with no production delay

Industries
Manufacturing plants and pharmaceutical facilities, where downtime is costly and access is controlled: 31 completed industrial and pharmaceutical sites.
The challenge
31completed industrial and pharmaceutical sites
Our experience
In a manufacturing plant, a failed process drain or sanitary line can stop a production line. Rehabilitation from inside the pipe keeps shutdown windows short.
Pharmaceutical and clean manufacturing spaces limit where crews can work and what can be disturbed. Trenchless methods minimize slab cuts inside controlled areas.
Our industrial work includes a GSK drug manufacturing plant and the Zschimmer and Schwarz plant in Milledgeville, Georgia.
Every section inspected is graded and documented, giving facility engineers the records their compliance and capital planning require.
The method
Infrastructure Intelligence locates and grades process and sanitary line defects before they force a shutdown, so rehabilitation can be scheduled into planned maintenance windows.
Explore Infrastructure IntelligenceOur crews




Case Studies
Cracked under-slab process piping found weeks before startup, lined around the clock in under two weeks.
Industrial & Pharmaceutical
What happens next
Tell us more about your infrastructure challenges.