An apartment building cut open at dusk, its homes lit floor by floor above the drain stacks

Industries

Multifamily & condominiums, without a full re-pipe

Apartments, garden-style communities, and low, mid, and high-rise condominiums. Our highest-volume industry, with 127 of 286 cataloged buildings.

The challenge

In a multifamily building, one failing stack reaches every home above it, and every resident feels it.

127of 286 cataloged buildings

By the Numbers

  • 40–75%less than conventional replacement
  • 50 yrliner life, backed by a 10-year warranty
  • 2–84 inpipe diameters
  • 4–1,000 ftpipe runs
  • 286completed projects
  • 2008founded

Our experience

What we see in Multifamily & Condominiums

  1. 01

    Apartments

    Rental communities where every shutdown affects residents. We coordinate directly with property management to schedule the work and notify residents, keeping disruption to a minimum.

  2. 02

    Garden-Style Communities

    Multi-building communities with long runs between buildings. At Ascott Place in Tampa, the work covered 231 units across 59 buildings, completed in March 2022.

  3. 03

    Low, Mid, and High-Rise

    From low-rise condominiums to luxury high-rise towers, vertical stacks carry the most risk: a failure in a lower section backs up every floor above it.

  4. 04

    Reserve Studies Built on Real Data

    Condominium boards plan reserves years ahead. A condition-graded evaluation gives the reserve study real pipe data instead of age-based estimates.

The method

Infrastructure Intelligence

Infrastructure Intelligence grades every pipe section, weights vertical stacks by the floors they serve, and gives boards and managers a prioritized plan they can build into the reserve study.

Explore Infrastructure Intelligence

Our crews

In the field

  • Crew members lining a riser through a vent stack on a building roof
  • Two crew members inverting a liner into a fountain's drain line
  • A crew feeding a hose into a manhole on a lawn
  • A cured CIPP liner, a new white pipe formed inside the old one

Case Studies

70vertical riser stacks lined

Promenade Towers

Bethesda, MD2021 to 2025

A riser evaluation survey, a two-stack pilot, then 70 vertical riser stacks lined across two 18-story towers.

2
pilot stacks, one per tower
0
full re-pipe needed
Read the case study

Multifamily & Condominiums

Featured Projects

All case studies

More projects

  • Van Ness North CooperativeWashington, DC · 2017 to 2026
  • Cathedral West CondominiumWashington, DC · 2020 to 2025
  • Circle CondominiumsArlington, VA · 2018 to 2026
  • Regents SquareSilver Spring, MD · 2022 to 2026
  • The LancasterArlington, VA · 2026

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.