A Dynamic Drain crew feeding a liner into an inversion unit on a job

Norfolk · Virginia Beach · Williamsburg

Pipe rehabilitation in Hampton Roads

14 completed Hampton Roads buildings, from Williamsburg to Virginia Beach and Cape Charles.

  • 14completed Hampton Roads buildings
  • 4named projects, from Cape Charles to Williamsburg
  • 40–75%less than conventional replacement

Hampton Roads

Local Experience in Hampton Roads

Alexandria, VAHeadquarters

  • Hampton Roads
  • Other published work
  • Mobilization base
Plotted from our published work history, one dot per metro.

We have completed work in 14 Hampton Roads buildings, including South Beach Apartments in Virginia Beach, Hampton Roads Foot and Ankle in Hampton, and William and Mary in Williamsburg. We serve Norfolk, Virginia Beach, Portsmouth, Newport News, Chesapeake, Hampton, Williamsburg, and Cape Charles.

Local Work

  • Multifamily & CondominiumsSouth Beach ApartmentsVirginia Beach, VA2020
  • HealthcareHampton Roads Foot and AnkleHampton, VA2020
  • Higher EducationCollege of William and MaryWilliamsburg, VA
  • Government & Public SectorChesapeake Bay Bridge-TunnelCape Charles, VA2020

Industries

Who We Work With in Hampton Roads

Multifamily and condominium communities, commercial properties, higher education. Our work at the Chesapeake Bay Bridge-Tunnel in Cape Charles is part of our Government & Public Sector work.

From evaluation to rehabilitation

How we Work

Evaluation study first, then prioritized findings, then rehabilitation of the sections that matter most.

What We Do

Most local work starts with an Infrastructure Intelligence evaluation and continues with CIPP rehabilitation, lining failing pipe from the inside instead of replacing it.

  1. A technician lowering an inspection camera into a roof vent, with the city skyline behind
    01

    Evaluation study

  2. A laptop showing a building floor plan with its pipe sections graded by condition
    02

    Prioritized findings

  3. A green liner inversion drum set up on a rooftop beside a vent stack
    03

    Rehabilitation

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.