Charlotte · Research Triangle

Pipe rehabilitation in Charlotte and the Research Triangle

11 completed North Carolina projects, our strongest secondary market by far.

  • 11completed North Carolina projects
  • 40–75%less than conventional replacement
  • 50 yrliner life, backed by a 10-year warranty

Charlotte / Research Triangle

Serving Charlotte and the Research Triangle

  • Charlotte / Research Triangle
  • Other published work
Plotted from our published work history, one dot per metro.

With 11 completed North Carolina projects, this is real, meaningful project history. Clients include Duke University, Duke University Medical Center and Duke Medicine in Durham, Cree/Wolfspeed, Hyster-Yale, and CSX Wilmington.

Our North Carolina Coverage

This page covers Charlotte and the Research Triangle.

Industries

Who We Serve

Higher education, industrial and manufacturing facilities.

From evaluation to rehabilitation

How we Work

What We Do

Most local work starts with an Infrastructure Intelligence evaluation and continues with CIPP rehabilitation, lining failing pipe from the inside instead of replacing it.

  1. A technician lowering an inspection camera into a roof vent, with the city skyline behind
    01

    Evaluation study

  2. A laptop showing a building floor plan with its pipe sections graded by condition
    02

    Prioritized findings

  3. A green liner inversion drum set up on a rooftop beside a vent stack
    03

    Rehabilitation

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.