Surveying 3,200 feet of piping and replacing a failed liner with trenchless CIPP lining in Washington, DC.

  • Washington, DC
  • 2024 to 2026
Government & Public Sector

Outcomes

$2M+saved compared to an excavation-based approach

  • 823 ftof failed liner removed
  • 1,120 ftof new CIPP lining installed
  • 240 hrssaved through trenchless rehabilitation
Client
British Embassy
Location
Washington, DC
Scope
3,200 ft surveyed, 1,120 ft of CIPP lining installed
Duration
2024 to 2026

01/ 04

Client Context

The British Embassy in Washington, DC is a government facility where Dynamic Drain has completed infrastructure rehabilitation work. Aging or failing below-grade piping at a facility of this kind carries operational and security considerations well beyond a typical commercial building, making early, accurate diagnosis and minimally disruptive rehabilitation especially valuable.

02/ 04

The Problem

Sanitary GIS map of the British Embassy campus, with the surveyed lines marked on an aerial photo
  1. 01

    A failed prior liner

    A prior liner within the Embassy’s piping system had failed.

  2. 02

    An unknown extent

    The full extent of the failure had to be established before any rehabilitation work began.

  3. 03

    A sensitive facility

    Below-grade piping at a government facility carries operational and security considerations beyond a typical commercial building.

03/ 04

Strategic Approach

  1. 01

    Diagnostic evaluation

    Surveyed 3,200 feet of piping to assess its condition and locate areas of concern.

  2. 02

    Defect identification and grading

    The survey identified 823 feet of failed liner that needed to be removed.

  3. 03

    Trenchless rehabilitation

    Crews removed the 823 feet of failed liner and installed 1,120 feet of new CIPP lining, without the excavation a conventional dig-and-replace approach would have required.

  4. 04

    Verification and reporting

    Dynamic Drain verified the completed rehabilitation and documented the results, including the time and cost avoided compared to conventional excavation.

04/ 04

Execution

Framed project summary for the Embassy of Great Britain, with its sanitary and storm GIS maps

Using trenchless CIPP rehabilitation, Dynamic Drain’s crew addressed the Embassy’s failed piping without the disruption, site restoration, and extended timeline a conventional open-cut approach would have required.

The survey came first, so the rehabilitation was scoped to the 823 feet of failed liner it found.

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.