Rockville · Baltimore · statewide
Pipe rehabilitation in Maryland
70 completed Maryland buildings, including Baltimore, and 17 in Rockville alone.
- 70Maryland buildings, including 5 in Baltimore
- 17buildings in Rockville
- 40–75%less than conventional replacement
Maryland
Local Experience Across Maryland
Alexandria, VAHeadquarters
- Maryland
- Other published work
- Mobilization base
We have completed work in 70 Maryland buildings: 65 across the state plus 5 in Baltimore, which is part of our Maryland history, not an afterthought. Rockville accounts for 17 of them, tied with Alexandria, VA for the second-highest concentration in our portfolio after Washington DC. Local work also includes the Clevenger Property in Beltsville and Brighton Village in Gaithersburg.
Local Work
- Multifamily & CondominiumsPromenade TowersA riser evaluation survey, a two-stack pilot, then 70 vertical riser stacks lined across two 18-story towers.
- Industrial & PharmaceuticalGSK Drug Manufacturing PlantCracked under-slab process piping found weeks before startup, lined around the clock in under two weeks.
- Multifamily & CondominiumsGrosvenor Park IIIA 2019 pilot, then a phased riser program: 27 kitchen and 2 bathroom riser stacks and 6 underground laterals lined.
- Multifamily & CondominiumsRegents Square
- Government & Public SectorNIST Campus, Buildings 223 and 226
Industries
Who We Work With in Maryland
Multifamily and condominium communities, commercial properties, higher education. Municipal and state clients such as MTA Baltimore and the Maryland State Highway Administration are covered by our Government & Public Sector work.
From evaluation to rehabilitation
How we Work
Evaluation study first, then prioritized findings, then rehabilitation of the sections that matter most.
What We Do
Most local work starts with an Infrastructure Intelligence evaluation and continues with CIPP rehabilitation, lining failing pipe from the inside instead of replacing it.
01Evaluation study
02Prioritized findings
03Rehabilitation
What happens next
Start your project
Tell us more about your infrastructure challenges.
- 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
- 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
- 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.