Pipe rehabilitation in Northern Virginia

Headquartered in Alexandria, with 64 completed Northern Virginia buildings and our crews minutes away.

  • 64completed Northern Virginia buildings
  • 17buildings in Alexandria, our headquarters city
  • 40–75%less than conventional replacement

Northern Virginia

Local Experience, Headquartered Here

Alexandria, VAHeadquarters

  • Northern Virginia
  • Other published work
  • Mobilization base
Plotted from our published work history, one dot per metro.

Our headquarters is in Alexandria, and Alexandria alone accounts for 17 of our 64 Northern Virginia buildings, tied with Rockville, MD for the second-highest concentration in our portfolio after Washington DC. Named local work includes the Army National Guard Readiness Center and The Lancaster in Arlington, the Marine One hangar at Quantico, The Eagles Club in Alexandria, and VDOT in Woodbridge. Our coverage includes Warrenton.

Local Work

  • Multifamily & CondominiumsCircle CondominiumsArlington, VA2018 to 2026
  • Government & Public SectorMarine One Hangar, Marine Corps Base QuanticoQuantico, VA
  • Government & Public SectorArmy National Guard Readiness CenterArlington, VA2024 to 2025
  • Multifamily & CondominiumsThe LancasterArlington, VA2026
  • CommercialThe Eagles ClubAlexandria, VA2021
  • Government & Public SectorVirginia Department of Transportation (VDOT)Woodbridge, VA2024

Industries

Who We Work With in Northern Virginia

Multifamily and condominium communities, commercial properties, higher education. Federal and high-security facilities are served through our Government & Public Sector work.

From evaluation to rehabilitation

How we Work

Evaluation study first, then prioritized findings, then rehabilitation of the sections that matter most.

What We Do

Most local work starts with an Infrastructure Intelligence evaluation and continues with CIPP rehabilitation, lining failing pipe from the inside instead of replacing it.

  1. A technician lowering an inspection camera into a roof vent, with the city skyline behind
    01

    Evaluation study

  2. A laptop showing a building floor plan with its pipe sections graded by condition
    02

    Prioritized findings

  3. A green liner inversion drum set up on a rooftop beside a vent stack
    03

    Rehabilitation

What happens next

Start your project

Tell us more about your infrastructure challenges.

  1. 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
  2. 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
  3. 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.