Our solutions
Diagnostics to restoration
Six coordinated services, from the first diagnostic survey to the final restored connection, delivered as one system by one team.
Core Solutions
Six services, one team
01Diagnostics and assessment
CCTV pipe inspection and camera surveys document the real condition of every line, so repair decisions start from evidence instead of assumptions.
02Infrastructure Intelligence
Our flagship evaluation program: system mapping, camera inspection, and graded findings turned into a prioritized action plan.
Learn more
03CIPP rehabilitation
Trenchless Cured-in-Place Pipe (CIPP) lining rebuilds failing pipe from the inside, without the demolition, displacement, and downtime of full replacement: a 50-year liner life with a 10-year warranty, 2 to 84 inch diameters, 4 to 1,000 foot runs, typically 40 to 75% less than replacement.
04Pipe cleaning and clearing
High-pressure hydro jetting and mechanical cleaning remove grease, scale, and debris to restore flow and prepare pipes for inspection or lining.
05Domestic water rehabilitation
Aging domestic and potable water lines are renewed with Uponor PEX alongside the sanitary drain, waste and vent rehabilitation, scheduled around residents and daily operations to keep disruption to a minimum.
06Reinstatement and restoration
After lining, branch connections are reopened and access points restored, returning the system to full service and the building to normal use.
The video
See how it works
From the first camera inspection to the lined, restored pipe, in under three minutes.
- Inspect
- Clean
- Line
- Restore
Where the work happens
Inside the walls
Every building has a plumbing system. And most of them are in worse shape than anyone knows.
The riser
Risers are the vertical pipes that carry water and waste between floors.
A new pipe inside the old
A resin-saturated liner is installed inside the existing pipe and cured in place, forming a new pipe within the old one, without full replacement. Work is performed from existing access points where possible; some projects require small access pits.
Connections reopened
Once a liner cures, robotic cutters reopen each branch connection from inside the pipe, returning the system to full service.
A failure low in the stack
Because every floor above depends on them, a failure low in the stack affects the whole building.
4–1,000 ftpipe runs
Riser and CIPP basics
Who we serve
Industries
- 01
Multifamily & Condominiums
Apartments, garden-style communities, and low, mid, and high-rise condominiums. Our highest-volume industry, with 127 of 286 cataloged buildings.
Learn more - 02
Higher Education
Residence halls, libraries, and academic buildings: 27 completed higher-education buildings, including work at the University of Virginia and Harvard University.
Learn more - 03
Government & Public Sector
Federal, military, municipal, and state facilities: 43 completed buildings, including the British Embassy in Washington, DC and four National Park Service sites.
Learn more - 04
Industrial & Pharmaceutical
Manufacturing plants and pharmaceutical facilities, where downtime is costly and access is controlled: 31 completed industrial and pharmaceutical sites.
Learn more - 05
Healthcare
Hospitals and medical facilities that have to keep operating while their infrastructure is rehabilitated: 12 completed healthcare facilities.
Learn more - 06
Commercial
Office, retail, and mixed-use buildings, where hidden pipe failures mean tenant disruption and unplanned capital cost: 46 completed commercial buildings.
Learn more
By the numbers
- 40–75%less than conventional replacement
- 50 yrliner life, backed by a 10-year warranty
- 2–84 inpipe diameters
- 2008founded
Selected clients










What happens next
Start your project
Tell us more about your infrastructure challenges.
- 01Evaluation studyThe system is mapped, inspected by camera, and every section is condition-graded.
- 02Prioritized findingsGrades are weighted by system risk and turned into a plan, most critical sections first.
- 03RehabilitationTrenchless CIPP lining of the sections that matter most, without full pipe replacement. Access requirements are confirmed during the evaluation.


